How Deep Does Sewer Line Have to Be?
Direct Answer • Key Takeaway
Sewage Lines, Including Force Mains and Laterals, Must Be Constructed at Least Three Feet Below the Proposed Grade Unless the Municipality or Utility Authority Permits Shallower Depths (As Measured from the Top of the Pipe to the Grade Elevation).
Tags:
how deep does sewer line have to be